Plain-language answers to common questions about planning, cost, equipment, approvals, and ongoing care. Site-specific decisions still need a qualified assessment.

Getting started

Do I need a Level 2 charger at home?

Level 2 uses a dedicated 240-volt circuit. It can suit drivers who need more overnight energy than a regular outlet provides. Compare your daily driving, available charging time, and vehicle charging limit.

Can I install a charger with a 100A panel?

Possibly. Panel size alone cannot establish capacity. A licensed electrical contractor must assess your electrical demand. Load management may be an option before a service upgrade.

How much does installation cost?

Every installation is quoted for its electrical scope. Cable length, installation route, equipment, panel capacity, and site conditions affect the quote. Request a written scope before accepting a price.

Permits & ESA

Who should carry out the electrical work?

Hire an appropriately licensed electrical contractor. Verify the business and licence directly with ESA. ECRA #7014495 is the licence number shown for this service.

What is an ESA notification?

It is the electrical work notification filed with the Electrical Safety Authority. The contractor should explain the inspection process and provide the applicable acceptance documentation.

Can I install it myself?

Use ESA’s official guidance to understand applicable requirements and who may perform work. Electrical work requires an appropriate qualified assessment.

Where do I verify a contractor?

Use ESA’s official contractor resources and confirm that the business identity matches the quoted contractor.

When is work notified?

ESA guidance explains notification before work begins and inspection requirements. Agree responsibility with your contractor.

What documents should I keep?

Keep the quote, invoice, equipment manual, warranty, and applicable acceptance documents.

Is an inspection always an appointment?

ESA determines its review and inspection process. Ask your contractor what applies to the specific work.

Panels & capacity

Can I install a charger with a 100A panel?

Possibly. Panel size alone cannot establish capacity. A licensed electrical contractor must assess your electrical demand. Load management may be an option before a service upgrade.

Does an empty breaker slot mean capacity?

No. Physical breaker space and allowable electrical demand are different.

Do all 100A homes need an upgrade?

No. Only a suitable load assessment can establish options.

Can two EVs share capacity?

A compatible, appropriately designed load-sharing system may be an option.

What if I add a heat pump later?

Include future loads in the electrical planning discussion.

What does EVEMS mean?

EV energy management system: equipment that controls EV charging in response to electrical demand or system limits.

Chargers

What does kWh mean?

A kilowatt-hour is a unit of energy. Charging at 1 kW for one hour uses 1 kWh before considering losses.

Will the charger reach its rated output?

The vehicle, circuit design, settings, temperature, and charging conditions may limit delivered power.

Are adapters universal?

No. Verify the precise combination and permitted use with the relevant manufacturers.

Should I choose hardwired or plug-in?

Compare the specific equipment, installation design, protection requirements, and intended use with your contractor.

Does every EV use the same connector?

No. Check your vehicle inlet, charger connector, and any adapter requirements with the vehicle and charger manufacturers. Avoid selecting equipment from the badge alone.

Where do you install residential chargers?

Our residential chargers are installed inside attached or detached garages, rather than on the exterior wall of the home. The site assessment confirms the interior mounting position and cable route.

Condos

Do I need condo board approval?

Condo installations require a building-specific approval process. Start with your property manager and the Condominium Authority of Ontario guidance. This information is general and is not legal advice.

Can tenants request charging?

Start with the property owner or manager. Property arrangements, consent, and applicable rules affect the process.

Who owns a condo charger?

The equipment ownership and ongoing responsibilities should be documented in the appropriate agreement.

How is shared charging billed?

The building may use a suitable metering or network arrangement. Confirm fees and administration responsibilities.

Can a building plan for more stalls?

A phased assessment can identify pathways, capacity, and later expansion requirements.

Commercial

Do businesses need DC fast charging?

Not always. Dwell time and vehicle needs should guide power selection.

Can charging generate revenue?

Revenue depends on demand, use, pricing, fees, and costs. No payback is guaranteed.

What is utilisation?

The share of available time that equipment is actively delivering energy, as defined in the model.

What maintenance is needed?

Follow equipment guidance and the actual service plan. Define inspection, cleaning, fault response, and software responsibilities.

Costs & after installation

What information helps with a quote?

Property type, vehicle, charger choice, electrical panel details, cable route, parking location, and photos that can be taken safely.

Do prices include the charger?

That depends on the written quote. Ask for equipment and installation to be itemised.

Are taxes included?

Your written quote should state the applicable taxes. Check the tax line on your written quote.

Can I supply my own charger?

Ask the contractor to review the exact equipment model, certification, and installation instructions before purchase.

Does a longer cable run cost more?

It can affect material, labour, access, and voltage-drop design. The actual installed route matters.

Is financing available?

The payment planner calculates example payments using the rate and term you enter. It is not a credit application.

What should I do if charging stops?

Record the message, follow manufacturer guidance, and contact the appropriate provider. Stop using damaged or apparently unsafe equipment.

Can I move a charger later?

A relocation requires a new assessment of the route, circuit, equipment, and notification needs.

How long does installation take?

Timing depends on the electrical scope, route, approvals, utility involvement, and inspection. A site review is needed before promising an installation date.

Is there an Ontario charger rebate?

Eligibility and funding change. Use the official resources on our rebates page. Confirm eligibility and approval with the programme administrator.

Plan your installation

A few details today. A clearer path to charging tomorrow.

Start your estimate ↗
CallPhoto briefEstimate ↗